Skip to content
← All resourcesBreath Alcohol Testing

BAT Error Correction Training After a Cancelled Alcohol Test

November 15, 2026 · 6 min read

By Jeff Schroeder, Foster Special Instruments

A cancelled DOT alcohol test costs the employer twice. The test is treated as if it never happened, so a random selection or a post-accident test has to be repeated or written off, and the breath alcohol technician (BAT) who caused the cancellation now has a 30-day training deadline. That deadline comes from 49 CFR 40.213(f), and it is the one part of BAT qualification that is triggered by an event instead of a calendar. This post covers which errors trigger it, what the training must include, and how to document it so the next audit does not find a gap.

What triggers BAT error correction training?

Error correction training is required when a BAT makes a mistake in the alcohol testing process that causes a test to be cancelled. The regulation defines that as a fatal flaw or an uncorrected flaw (40.213(f)). The trigger is the cancellation, not the mistake alone. If a BAT forgets to sign the Alcohol Testing Form (ATF) and the error is corrected, the test stands and no error correction training is required. If the same unsigned form is never corrected, the test is cancelled and the training clock starts. The 30 days run from the date the BAT is notified of the error, not from the date of the test. In practice, notice usually comes from the employer's designated employer representative (DER) or a third-party administrator reviewing paperwork, sometimes weeks after the collection. A BAT who keeps testing past day 30 without completing the training is no longer meeting the requirements of 40.213, which puts every later test that BAT conducts at risk. Track the notification date in writing the day it arrives.

Which alcohol testing errors are fatal flaws?

49 CFR 40.267 lists the problems that always cancel a test. They cannot be fixed after the fact. 49 CFR 40.269 lists correctable flaws, which cancel the test only if they are not corrected.

ErrorTypeSection
Confirmation test started before the 15-minute waiting period endsFatal40.267(c)(1)
No air blank before the confirmation testFatal40.267(c)(2)
Air blank before confirmation does not read 0.00Fatal40.267(c)(3)
EBT does not print the confirmation resultFatal40.267(c)(4)
EBT display and printout show different test number or resultFatal40.267(b)
ASD read too early or too late, or used past its expiration dateFatal40.267(a)
BAT or STT does not sign the ATFCorrectable40.269(a)
No Remarks note when the employee does not sign after the resultCorrectable40.269(b)
Non-DOT form used for the testCorrectable40.269(c)

One fatal flaw is not about the BAT at all. If the next external calibration check of an EBT falls outside the tolerance in the manufacturer's quality assurance plan, every result of 0.02 or above since the last valid check is cancelled (40.267(c)(5)). That is a device problem, and it is the reason calibration records matter as much as training records. Our post on EBT quality assurance plans and calibration checks covers that side.

What does error correction training have to include?

The rule is narrower than refresher training, which is the point. Error correction training covers only the subject matter areas in which the error occurred (40.213(f)(2)). A BAT who skipped the air blank does not need to repeat the full DOT Model BAT Course. The training must be given, and the BAT's proficiency documented in writing, by a person who meets the instructor requirements in 40.213(b)(4): at least a year of regularly conducting DOT alcohol tests as a BAT, a year of conducting BAT training under Part 40, or completion of a train-the-trainer course (40.213(f)(1)). The proficiency part is specific. The BAT must complete three consecutive error-free mock tests, one with an uneventful scenario and two built around the area where the error happened (40.213(f)(3)). The trainer monitors and evaluates those mock tests and attests in writing that they were error-free. A short refresher conversation with a supervisor, with no mock tests and no written attestation, does not meet the rule.

How is error correction training different from refresher training?

ItemError correction (40.213(f))Refresher (40.213(e))
TriggerA BAT error that cancels a testFive years since qualification
DeadlineWithin 30 days of notificationNo less often than every five years
ScopeOnly the subject area of the errorFull qualification training
Mock testsThree consecutive error-freeSeven consecutive error-free
Who evaluatesInstructor meeting 40.213(b)(4)Instructor meeting 40.213(b)(4)

Error correction training does not reset the five-year refresher clock. The refresher date still runs from the original qualification and proficiency demonstration. Our post on BAT recertification requirements covers that schedule.

What should happen right after a test is cancelled?

Under 49 CFR 40.271, a BAT who becomes aware of a fatal flaw during or shortly after testing must try to correct the problem promptly, if practicable, and may repeat the testing process. A repeat test needs a new ATF and a new sequential test number, and a new device if needed. If no other device is available at the site, the BAT must immediately notify the DER that the test could not be completed. Repeating the test on the spot does not erase the error. The original test was still cancelled, so the BAT still owes error correction training. The employer should log three dates: the test date, the date the BAT was notified, and the date training was completed. Under 40.213(g), the BAT must maintain documentation showing they currently meet the qualification requirements, and the error correction attestation becomes part of that file.

How Foster handles error correction training

Foster runs DOT BAT training and services the breath testing devices our customers use, so a cancelled test usually reaches us as a phone call asking whether the device or the technician was at fault. The first thing we ask for is the ATF and the EBT printout. Those two documents tell us whether the error sits in the procedure, like a short waiting period or a missing air blank, or in the device, like a failed calibration check that needs EBT calibration service. If it is procedural, the session is built around that error. The BAT runs an uneventful mock test and two mock tests that recreate the mistake, on the same device model they use in the field, and the instructor signs a written attestation when all three are error-free. The employer gets a copy for its own file instead of relying on the technician to keep it. For multi-site programs with several BATs, see training a backup BAT, so one technician's error correction window does not stop testing at a location.

Frequently asked questions

Can a BAT keep testing while waiting for error correction training?

The rule gives the BAT 30 days from notification to complete the training (40.213(f)). After day 30 without it, the BAT no longer meets the requirements of 40.213 and should not conduct DOT tests until the training is done.

Does a correctable flaw require error correction training?

Only if it is not corrected. A correctable flaw under 40.269 cancels the test only when it stays uncorrected, and training is triggered by the cancellation (40.213(f)).

Can our own supervisor give error correction training?

Yes, if the supervisor meets the instructor qualifications in 40.213(b)(4) and documents the three error-free mock tests in writing. A supervisor without that background cannot attest to proficiency.

Does an STT have the same requirement?

Yes. 40.213 applies to both screening test technicians and BATs, and the error correction paragraph does not distinguish between them.

Sources

Need a BAT retrained after a cancelled test? Request a quote.

Get a price for your program

Intoxilyzer instruments, dry-gas standards, forms, and mouthpieces, plus BAT technician and train-the-trainer courses and instrument calibration, from one partner.

CallBook a timeGet price